Demolition of disused footbridge, former library and residential properties as part of major regeneration project.
Demolition of a former Biffa waste station as part of the early phases of a multi-million pound regeneration
Demolition of Former Car Park Structure at Hall Place, to enable redevelopment to provide 60 new homes in the heart of Westminster
Segregation and complete removal of rear additions and associated enabling works as part of a large refurbishment project
Demolition of the redundant asbestos clad distribution warehouse, associated offices, workshops and hard standing
Following a fire, Goody Demolition Ltd were contracted by ISG Retail to carry out the remedial works necessary to strip Morrison’s superstore in Folkestone back to the supporting steel superstructure, in order to facilitate refurbishment.
Demolition of the redundant asbestos clad distribution warehouse, associated offices, workshops and hard standing
Segregation and complete removal of rear additions and associated enabling works as part of a large refurbishment project
a prompt and efficient service to test, analyse and classify soils prior to commencement of works
safe and compliant removal of chemical and oil tanks of all types
onsite and offsite treatment of soils and contaminated materials to provide the most cost-effective and environmentally responsible solution
both from above ground such as Japanese knotweed and on water such as duck weed from river culverts
Demolition of the redundant asbestos clad distribution warehouse, associated offices, workshops and hard standing
Following a fire, Goody Demolition Ltd were contracted by ISG Retail to carry out the remedial works necessary to strip Morrison’s superstore in Folkestone back to the supporting steel superstructure, in order to facilitate refurbishment.
ensuring your site has appropriate perimeter hoardings to protect site operatives and passers by
making sure your site has the necessary safety signage in order that it is construction ready
installing alarm systems and on-site security to ensure your development is fully protected from day one
undertaking the removal of refuse, vermin, medical sharps and both oil and chemical waste safely and compliantly
building access routes, temporary roads, hard standing, drainage and set up for site welfare
Demolition of Former Car Park Structure at Hall Place, to enable redevelopment to provide 60 new homes in the heart of Westminster
Segregation and complete removal of rear additions and associated enabling works as part of a large refurbishment project